Upgrade to Widespread ATM Network

By Go2ITGroup
April 12, 2019 Category: General, Upgrades, Financial, Case Studies

upgrade to widespread atm network On behalf of a national bank, Go2IT upgraded the hardware in over 2,000 ATMs located at gas stations throughout the Southwest United States. Although technicians did not have access to any cash reserves, security was still of the utmost concern. Go2IT screened potential techs and preformed stringent background checks on those selected. Site visits were coordinated with bank representatives, who provided the required access to the units. Over a 4 month span, Go2IT upgraded all 2,000+ ATMs and while suffering zero security breaches.

Electronics Retailer Upgrades All Stores

By Go2ITGroup
April 12, 2019 Category: General, Upgrades, Retail, Case Studies

electronics retailer upgrades all stores A prominent consumer electronics retailer needed to upgrade POS devices and servers at all physical locations within the United States. The client partnered with The Go2IT Group for this deployment due to the ability to provide technical resources in all regions. Pilot sites were completed in order to allow for a streamlining of processes and procedures for future site visits. Project coordinators worked with project managers, site contacts and other personnel to serve as an escalation point for all parties. We ensured all client deliverables were completed and accounted for, and that each store manager was satisfied with the service received at their particular store.

Remote Users Scattered Across the US

By Go2ITGroup
April 12, 2019 Category: General, Upgrades, Break/Fix, Case Studies

Remote Users Scattered Across the US An organization with remote field workers required a workstation upgrade for its mobile workforce, comprised of more than 1,000 employees scattered across 31 states. Most users were located in rural or scarcely populated regions, making it difficult to get skilled professionals to the remote sites. Go2IT was up to the challenge, successfully deploying all 1,224 PCs and laptops over a 3 month period.

Thousands of Motherboards Recalled

By Go2ITGroup
April 12, 2019 Category: General, Upgrades, Break/Fix, Government, Case Studies

thousands of Motherboards Recalled A team of technicians were required to replace nearly 2,000 motherboards on laptops purchased by a major metropolitan school district. Technicians were required to receive replacement parts, verify unit count and condition of equipment, remove and replace the motherboard, restart unit to verify successful reboot, repackage old equipment and properly clean service area. Technicians were given weekly quotas and a list of district buildings and addresses along with corresponding unit counts and were responsible for creating their own schedule. Go2IT was required to maintain an on-time arrival rate of 97% and a customer satisfaction rate of 98% throughout the duration of the project.

POS Upgrade for National Restaurant Chain

By Go2ITGroup
April 12, 2019 Category: General, Upgrades, Retail, Case Studies

POS Upgrade for National REstaurant Chain A national restaurant chain experiencing rapid growth needed to implement a point-of-sale (POS) system in over 250 new locations spread out throughout the continental United States. All peripherals were upgraded as well, including receipt printers, monitors, and credit cards swipes. Technicians were also responsible for cable management, troubleshooting of any issues, and site cleanup. Go2IT successfully completed 100% of the sites on time and within budget.

Categories
General (9)
Case Studies (9)
Upgrades (5)
Break/Fix (2)
Retail (2)
Installation (1)
Insurance (1)
Government (1)
Transportation (1)
Financial (1)
Rapid Response (1)
Utility (1)
Healthcare (1)
Medical (1)
+ Show More

866-424-1233

Contact Us

 

26260 Center Ridge Rd., Westlake OH 44145

 

© , The Go2IT Group, All Rights Reserved
  • Privacy Policy
  • Terms and Conditions
  • Email Us
  • Blog

  • Powered by Virteom Logoirteom